Calendar module icon

Calendar

View all calendars is the default. Choose Select a Calendar to view a specific calendar.

Date:
March 17, 2020
Time:
5:00 PM - 7:00 PM
Location:
Town Hall
Address:
128 S. Main St.
Holly Springs, NC 27540
Facebook Twitter Email

Holly Springs Road Widening - Phase 2 - Open House

Tuesday, March 17, 2020

View the updated plan for the proposed Holly Springs Road widening from Flint Point Lane to Sunset Lake Road, talk with town staff and provide feedback.

View the updated plan for the proposed Holly Springs Road widening from Flint Point Lane to Sunset Lake Road, talk with town staff and provide feedback. The Holly Springs Road Widening project is among the transportation bond projects Holly Springs voters approved in November of 2018.

The project involves widening Holly Springs Road to a consistent four-lane, median-divided road with sidewalk, curb and gutter, and pedestrian crossings. The purpose of the project is to increase road capacity ahead of the 540 interchange planned on Holly Springs Road, upgrade the Middle Creek crossing, and provide safe pedestrian routes. The project is at the 25% design stage, which means that the base design and layout of the proposed widening can be viewed.

Drop by the first-floor Holleman Room at Holly Springs Town Hall anytime from 5-7 p.m.