Transportation Projects

Project Name Description
Avent Ferry Road Right Turn Lane at Cass Holt Road Adding a right turn lane from Avent Ferry Road onto Cass Holt Road
Avent Ferry Road Widening Phase 1 Completing widening of Avent Ferry Road from NC 55 to Ralph Stevens Road (formerly Piney Grove Wilbon Road)
Avent Ferry Road Widening Phase 2 Widening Avent Ferry Road from Ralph Stevens Road (formerly Piney Grove Wilbon Road) to Cass Holt Road
Ballentine Traffic Signal Installing a traffic signal at the intersection of South Main and Ballentine streets
Bypass Connection at Sportsmanship Way Connecting NC 55 with Sportsmanship way by adding a left turn lane on NC 55 for vehicles turning onto Sportsmanship Way and a signalized U-turn north of Sportsmanship Way
Crosswalk Safety Improvements Adding flashing beacons at eight crosswalks to improve crosswalk safety by alerting motorists to pedestrians on crosswalks
Main Street Sidewalk North Building a sidewalk along Main Street, connecting the Oak Hall neighborhood and Ting Park
New Hill Road Sidewalk Creating a pedestrian connection between existing sidewalk at the shopping center and proposed and existing subdivision sidewalks
Sunset Lake Road Sidewalk Connecting the existing sidewalks south of Wescott and north of Optimist Farm Road
Town Hall Commons Utilities and Infrastructure Improvements Adding parking, a regional stormwater control measure, extending Rogers Road, updating water and sewer lines
Utley Creek Greenway Constructing a greenway to connect existing greenways in east and west Holly Springs by using an existing pedestrian tunnel under NC 55

Water and Sewer Projects

Project  Name Description
Apex Meter Vault Replacement Replacing an inoperable meter to allow an accurate account of water usage from a neighboring town
Avent Ferry Force Main Replacing sewer line to provide additional system capacity and increase pump station efficiency
East Regional Pump Station Construction of pump station to provide needed capacity
School Days Lane Waterline Constructing a new water line to improve system performance and emergency water connections with other towns
Sugg Farm Utilities Improvements Widening and replacing road, installing water and sewer lines and a dumping station
Town Hall Commons Utilities and Infrastructure Improvements Adding parking, a regional stormwater control measure, extending Rogers Road, updating water and sewer lines
Utley Creek Force Main Repair Replacing existing pipes to extend the life of the lines
Wastewater Treatment Plant Phase 2 Manhole Repair Repairing a corroded manhole and piping

Stormwater Projects

Project Name Description
Estes Stream Bank Repair Repairing two locations where erosion has occurred on a stream bank
Gable Ridge Culvert Replacement Replacing an existing pipe that is failing due to corrosion
Sugg Farm Utilities Improvements Widening and replacing road, installing water and sewer lines and a dumping station
Town Hall Commons Utilities and Infrastructure Improvements Adding parking, a regional stormwater control measure, extending Rogers Road, updating water and sewer lines

Other Projects

Project Name Description
Carl Dean Greenway Exercise Equipment Placement Placing exercise equipment along the Carl Dean Greenway
Cemetery Upgrade Constructing a road, building storm drain upgrades, and creating a level grassed area to increase usable cemetery area
Methodist Church Parking Lot Phase 2  Extending the existing parking lot and adding 32 parking spaces