Sunset Lake Road Sidewalk

Project description:

This section of sidewalk will connect the existing sidewalk south of the Wescott subdivision to the existing sidewalk north of Optimist Farm Road. A pedestrian signal also will be installed. The sidewalk will complete the connection between the residential areas south of Optimist Farm Road to the Holly Lakes Shopping Center, which currently is under construction.

Status:

  Conceptual 
>Design
  Right-of-Way Acquisition 
  Under Construction
  Complete

17 Sunset Lake Road Sidewalk, Ph II Exhibit

Schedule:

Design CompleteSummer 2018
Public MeetingN/A
Right-of-Way AcquisitionN/A
BiddingN/A
ConstructionSpring 2019
ClosuresN/A

Project information:


16-017 Plans/Exhibits Click here to view plans.

Contact information


Engineering


For more information about transportation (roads, intersection improvements, sidewalks), water, sewer and stormwater, contact Engineering.
email | (919) 557-3939

Planning & Zoning


For more information about land use, building setbacks, parking, landscaping, architecture and design, contact Planning & Zoning.
email | (919) 557-3908